Past Projects

NYU Classroom
NYU Classroom

Finished classroom featuring Armstrong Suprafine 9/16" suspended ceiling.

NYU Classroom
NYU Classroom

Finished classroom featuring Armstrong Suprafine 9/16" suspended ceiling.

Classroom loaded with materials
Classroom loaded with materials

Materials loaded and metal framing started.

NYU Classroom
NYU Classroom

Finished classroom featuring Armstrong Suprafine 9/16" suspended ceiling.

1/5
NYU College Classroom

NYU remodeled classrooms in the Stern business school. In a strict time frame we were able to perform and install:

  • Demolition

  • Layout

  • Metal framing and soffits

  • Drywall

  • Insulation

  • Spackle and tape

  • 9/16" ceiling grid and tegular tile

  • Wood Blocking

  • Knock down frames

  • Metal doors and hardware

  • Interactive whiteboards

  • Coat hooks

 

 

Sonnier & Castle NYC

In one weekend we were able to remodel Sonnier & Castle's reception area and back office. The scope of work included:

  • Demolition

  • Metal framing

  • Drywall

  • Insulation

  • Knock down frame

  • Metal door and hardware

  • Spack and tape

  • 9/16" silhouette bolt slot ceiling and tile

  • Wire reception desk

  • Patch 3/4" oak floor and base

Sonnier & Castle Reception Area
Sonnier & Castle Reception Area

Demolished existing windows, framed and drywalled reception area.

Back office
Back office

Demolished and framed in existing door. Demolished a new door opening, framed and installed a new knock down door frame.

Office
Office

Installed drywall, tape and spackle on opposite side of reception area. Existing bolt slot ceiling was tied into new wall.

Sonnier & Castle Reception Area
Sonnier & Castle Reception Area

Demolished existing windows, framed and drywalled reception area.

1/4
Newark, NJ
Signature Flight Support

Performed a range of carpentry work for Signature Flight Support's temporary office and terminal. The scope of work included:

  • Demolition

  • Layout

  • Heavy and light gauge framing

  • 15/16" Armstrong ceiling and hard ceilings

  • Drywall, Moisture & Mold resistant drywall and cement board

  • Wood blocking

  • Welded door frames

  • Wood doors and hardware

Signature Flight Support
Signature Flight Support

Finished reception area.

Lobby
Lobby

Finished lobby with new framing, drywall and 2x2 15/16" ceiling. The acoustical ceiling is attached with seismic wiring per NY/NJ Port Authority code.

Concrete pad
Concrete pad

Tools loaded onto concrete pad that will be built into offices via heavy gauge framing.

Signature Flight Support
Signature Flight Support

Finished reception area.

1/13