Recent Projects

Spring Valley, NY
BMW Remodel

Remodeled BMW dealership in Spring Valley, NY. Working with an out of state GC, we were able to perform and install:

 

  • Engineered & Shop Drawings Provided By: Clark Dietrich

  • G60 Cold Formed Metal Stud Framing

  • LVL Structural Wood Framing

  • Sound Batt and Foil Faced Insulation

  • Suspended Drywall Ceilings and Soffits

  • Armstrong 15/16" Prelude XL HD Acoustical Ceilings

  • Armstrong 1912 Ultima Tegular Ceiling Tiles

  • Hunter Douglas Techstyle Reveal Edge Wall Channel

  • Hunter Douglas 48"x48" Techstyle Classic Tech E Clipped Ceiling Panels in White

  • Fire Rated Exterior Sheathing

  • Commercial Tyvek

  • 5/8" Moisture Resistant and Type-X Gypsum Board 

  • Level 4 and Level 5 Drywall Finish

  • Parapet and Roof Blocking with Pressure Treated Lumber

  • Installation of Turncraft Poly-Classic Column Covers

  • Installation of Doors and Hardware

  • Installation of Bathroom Accessories

  • Installation of Access Panels

  • Installation of Temporary Partitions

Greenwich, CT
Audi Service Building Remodel

After the Audi sales building was remodeled we began remodeling the Service building in Greenwich, CT. Working with an out of state GC, we were able to perform and install:

 

  • Engineered & Shop Drawings Provided By: Clark Dietrich and Hunter Douglas

  • G90 Cold Formed Metal Stud Framing

  • Suspended Drywall Ceilings and Soffits

  • Armstrong 15/16" Prelude XL HD Acoustical Ceilings

  • Armstrong 1774 Dune Ceiling Tile

  • Hunter Douglas Metal Ceiling Luxalon 12"x48" Torsion Spring Interior with Soundex Acoustical Backer and Exterior Soffit

  • 5/8" Fire Rated Exterior Sheathing

  • Commercial Tyvek Wrap

  • Moisture Resistant Gypsum Board 

  • Level 4 and Level 5 Drywall Finish

  • Parapet and Roof Blocking with Pressure Treated Lumber

  • Installation of Doors and Hardware

  • Installation of Bathroom Accessories

 

 

Greenwich, CT
Porsche Sales Remodel

Remodeled Porsche Sales building in two phases to keep the dealership open during construction. Construction began after completing the remodel of their service building. Working with an out of state GC, we were able to perform and install:

 

  • Engineered & Shop Drawings Provided By: Clark Dietrich

  • G90 Cold Formed Metal Framing

  • LVL Wood Framing

  • Sound Batt and Foil Faced Insulation

  • Suspended Drywall Ceilings and Soffits

  • USG Donn 9/16" Centricitee DXT Acoustical Ceilings

  • USG Frost #418 Ceiling Tiles

  • Hunter Douglas 300c Linear Plank Ceiling

  • Fire Rated Exterior Sheathing

  • Commercial Tyvek

  • 5/8" Moisture Resistant Gypsum Board 

  • Level 4 and Level 5 Drywall Finish

  • Parapet and Roof Blocking with Pressure Treated Lumber

  • Installation of Doors and Hardware

  • Installation of Bathroom Accessories

  • Installation of Access Panels